SWQR Groupings Operatives
Prior to April 2017 these would of been your typical groupings, these no longer apply
Operatives
Excavation in the road/highway = units 1, 2 & 3
- Location & avoidance of underground apparatus
- Signing, lighting & guarding
- Excavation in the highway
Excavation, backfilling and reinstatement – cold lay = units 1 – 6
- Location & avoidance of underground apparatus
- Signing, lighting & guarding
- Excavation in the highway
- Reinstatement & compaction of backfill materials
- Reinstatement of sub-base and base (roadbase) in non-bituminous materials
- Reinstatement of cold-lay materials
Reinstatement hot & cold lay bituminous materials = units 1, 2, 6 & 7
- Location & avoidance of underground apparatus
- Signing, lighting & guarding
- Reinstatement of cold-lay materials
- Reinstatement of hot-lay materials
Reinstatement of concrete slabs = units 1, 2 & 8
- Location & avoidance of underground apparatus
- Signing, lighting & guarding
- Reinstatement of concrete slabs
Reinstatement of modular surfaces & concrete footways = units 1, 2 & 9
- Location & avoidance of underground apparatus
- Signing, lighting & guarding
- Reinstatement of modular surfaces & concrete footways
Signing, lighting & guarding = unit 2
Signing, lighting & guarding